Production Part Approval Process (PPAP)
an AIAG Core Tools training course from The QC Group

You will become familiar with the work required before an actual PPAP can be performed, the process of developing and submitting a Part Submission Warrant (PSW), the forms that must be used, and the PPAP requirements of the major auto, truck and tire manufacturers.

jump to registration

TARGET AUDIENCE

Anyone involved with PPAP submissions, including those in quality, engineering, and those involved in the testing or measurement of PPAP sample parts.

Prerequisite: It is desirable but not absolutely necessary that participants should have some degree of knowledge of FMEA, SPC, Gage R&R, and/or APQP. Bring in a copy of one of your own PPAP submissions!

COURSE DELIVERY

Public Workshop,
or On-site

COURSE CATEGORY

Six Sigma, Lean, Core Tools

BENEFITS

The Automotive Industry Action Group (AIAG) PPAP manual is used as the reference material for this class. Copies of the manual can be obtained through AIAG via their website www.aiag.org. Membership in AIAG has its benefits; if your company is not a member of AIAG, The QC Group can provide manuals at additional cost.
In order to have the highest likelihood of success with this class, we encourage the students to obtain their reference materials as soon as possible in order to have plenty of time to familiarize themselves prior to the class date.

AGENDA

  • PPAP, APQP, FMEA, SPC, QS-9000 and ISO/TS 16949 -- the connection
  • PPAP requirements
    • Design Records and Engineering Change Documents
    • Design FMEA
    • Process Flow Diagrams and Process FMEA's
    • Dimensional Verifications
    • Material Performance Test Results Records
    • Process Capability Studies; Use of SPC
    • Gage R&R (Measurement Systems Analysis) Studies
    • Qualified Laboratory Documentation (QS-9000 3rd Edition)
    • The Part Submission Warrant (PSW)
    • Appearance Approval Report (AAR)
    • Sample and Master Sample Production Parts
  • Customer notification and submission requirements
    • PSW customer submission levels 1-5
    • Approval and rejection of PSW's
  • Customer specific requirements
    • Ford
    • GM
    • DaimlerChrysler
    • Truck OEM's
    • Tire Manufacturers
  • Exercises
    • Bulk Material Requirements Checklists
    • Bulk Material Interim Approval Forms
    • ...according to Ford, GM, DaimlerChrysler, Truck OEM's and Tire OEM's

 

 
 

To register for Production Part Approval Process (PPAP):


Complete the form below, select Date/Location, click Register. You will have the opportunity to review the information before completing the course registration.

All fields are required.


Student Name:
Title:
Company Name:
Mailing Address:
City: State:
Zip:
Phone:
(Numbers only)
Email:
Check if this entry will be used as the billing information at checkout.


Classes Available
06/11/2014 - 06/11/2014 Minneapolis, MN $425
09/10/2014 - 09/10/2014 Pittsburgh, PA $425
11/12/2014 - 11/12/2014 Los Angeles, CA $425
12/10/2014 - 12/10/2014 Minneapolis, MN $425


Continue Shopping
 
Ask A Questions About This Class   Request A Quote   View All Of Our Training Titles
Call our Training Coordinator at 952-746-5725 (8-4pm Central Time, M-F) with any questions about training with The QC Group.

SmartCart Ecommerce System SmartCart® Ecommerce

Our Commitment

Ourdedicated professional training and consulting staff will provide you with the highest quality training workshops and consultation services to meet all of your quality trainingand consulting needs.

Sign up for Newsletter